BPC LINE WORK

 Bhutan Power Corporation line work at Mongar Gyelposhing which is from 7th-17 February, 2026

FOR FOUR POLE FITTING WORKS



Cross mark for 4 pole channel fitting 

4 pole channel fitting 

SC stands for stray fitting


"D" stand for disk fitting 

"D" stands for disk fitting

"T" for ground level transformer fittings


"G" before disk fitting there is gun fitting 

"L" stands for LBS (load breaker switch)  fitting 



FOR THREE POLE FITTING WORKS

3 POLE FITTING

3 POLE CROSS FITTING 


3 POLE LINE WORK AND FITTING

3 POLE BEFORE JAMPALING WORK



DOUBLE POLE FITTING WORKS

DP TAPPING POINT FULLY COMPLETED

DP JAMPALING COMPLETED

ALL LINE POINT ARE COMPLETED

4 pole JAMPALING

4 POLE NEUTRAL JAMPALING FROM LOWER PART



LOAD BREAK SWITCHES (LBS) FITTING

LBS FITTING 


LBS FITTING 


LBS SWITCH FITTING