Bhutan Power Corporation line work at Mongar Gyelposhing which is from 7th-17 February, 2026
FOR FOUR POLE FITTING WORKS
![]() |
| Cross mark for 4 pole channel fitting |
![]() |
| 4 pole channel fitting |
![]() |
| SC stands for stray fitting |
![]() |
| "D" stand for disk fitting |
![]() |
| "D" stands for disk fitting |
![]() |
| "T" for ground level transformer fittings |
![]() |
| "G" before disk fitting there is gun fitting |
![]() |
| "L" stands for LBS (load breaker switch) fitting |
FOR THREE POLE FITTING WORKS
![]() |
| 3 POLE FITTING |
![]() |
| 3 POLE CROSS FITTING |
![]() |
| 3 POLE LINE WORK AND FITTING |
![]() |
| 3 POLE BEFORE JAMPALING WORK |
DOUBLE POLE FITTING WORKS
![]() |
| DP TAPPING POINT FULLY COMPLETED |
![]() |
| DP JAMPALING COMPLETED |
![]() |
| ALL LINE POINT ARE COMPLETED |
![]() |
| 4 pole JAMPALING |
![]() |
| 4 POLE NEUTRAL JAMPALING FROM LOWER PART |
LOAD BREAK SWITCHES (LBS) FITTING
![]() |
| LBS FITTING |
![]() |
| LBS FITTING |
![]() |
| LBS SWITCH FITTING |